FLXCode Concrete Calculator

FLXCode apps

Appearance

Concrete Calculator

Enter the size of the slab, footing, column or steps. You get cubic yards, premix bags and the ready-mix order, with waste added.

Slab
Bag yields (cu ft per bag)

Example Slab, with 10% waste

1.36 cubic yards

Amounts
Ready-mix to order1.5 cu yd (rounded up to the next 1/4)
Cubic feet36.7
Cubic metres1.04
Without waste1.23 cu yd, 33.3 cu ft
Weightabout 5,500 lb

Premix bags

Bags needed
40 lb bag (0.3 cu ft)123 bags
50 lb bag (0.375 cu ft)98 bags
60 lb bag (0.45 cu ft)82 bags
80 lb bag (0.6 cu ft)62 bags

The sums

  • Rectangle: 10 ft x 10 ft x 4 in 33.33 cu ft

Premix bag counts are for the same volume with waste. Ready-mix plants may add a fee for loads under a minimum.

No ads. No account. Nothing you type or record is uploaded. We count page events with a daily code. Check it.

Problem or idea? Email us

Quick start

  1. Pick what you are pouring. A slab is the default.
  2. Type the length and width in feet and inches. Depth is in inches. Use the unit switch for metres and centimetres.
  3. Use Add area if the pour has more than one part, such as a patio and a walk.
  4. Read the ready-mix yards or the bag counts. Check the waste percent.

Worked examples

These use the same engine as the tool above, with 10% waste.

JobCu yd with waste80 lb bagsReady-mix order
Patio slab, 10 ft x 10 ft x 4 in1.36621.5 cu yd
Garage floor, 20 ft x 20 ft x 5 in6.793067 cu yd
Sidewalk, 3 ft x 25 ft x 4 in1.02461.25 cu yd
Round pad, 8 ft across x 4 in0.68310.75 cu yd
Footing, 40 ft x 16 in x 8 in1.45661.5 cu yd
Fence post hole, 10 in across x 3 ft deep0.0730.25 cu yd

Steps: three steps, 7 in rise, 11 in tread and 4 ft wide come to 14.1 cu ft with waste, or 0.52 cu yd.

The formula

For a flat slab or a footing:

cubic feet = length (ft) x width (ft) x thickness (in) / 12

Then divide by 27 for cubic yards and multiply by 1 + waste. Other shapes:

  • Circle or column: 3.1416 x (diameter / 2)^2 x depth
  • Ring or tube wall: 3.1416 / 4 x (outer^2 - inner^2) x depth
  • Steps poured solid from the ground: width x tread x rise x n(n + 1) / 2

Bags are the total cubic feet divided by the yield printed on the bag, rounded up.

Numbers this uses

Every constant the tool uses is listed here with its source. Where a number varies, you can edit it in the tool.

  • 40 lb bag yield is 0.3 cu ft. Quikrete 40 lb bag label: 0.30 cu ft.
  • 50 lb bag yield is 0.375 cu ft. scaled from the 80 lb label (0.60 per 80 lb), check your bag.
  • 60 lb bag yield is 0.45 cu ft. Quikrete 60 lb bag label: 0.45 cu ft.
  • 80 lb bag yield is 0.6 cu ft. Quikrete 80 lb bag label: 0.60 cu ft.
  • Concrete weight is 150 lb per cu ft. normal-weight concrete, about 4,050 lb per cu yd.
  • Waste is 10%. spills, uneven subgrade and over-dig, a common contractor allowance; editable.
  • Ready-mix rounding is next 1/4 cu yd. plants sell by the quarter yard, short loads often cost extra.
  • Cubic yard is 27 cu ft. 3 ft x 3 ft x 3 ft.

Bags or a truck

One cubic yard is a lot of bags: 45 of 80 lb. That is about 3,600 lb to lift and mix, and a mixer holds only a few bags at a time. Below about half a yard, bags are fine. Above one yard, a truck is worth the delivery fee for most people. In between, it depends on your back and your schedule.

Concrete starts to set within a couple of hours, so a hand-mixed pour must be finished in batches that match your speed. A truck gives you a continuous pour.

Common mistakes

  • Mixing units. Depth in inches must become feet before you multiply, or you overshoot by 12 times.
  • Forgetting the subgrade. If you dig 4 in of gravel under the slab, that is not part of the concrete volume.
  • Measuring the inside of forms in one place only. Measure at both ends and the middle, and use the average depth.
  • Using the wrong bag yield. Brands differ a little, so read the label and edit the yields under the form.
  • Ordering exactly what you calculated. A pour that is short by a few cubic feet is a bad day.

Your sizes stay in this page and are not uploaded. We count events without cookies (details).

FAQ

How many bags of concrete do I need for a 10 x 10 slab?

A 10 ft by 10 ft slab 4 in thick holds 33.3 cu ft. With 10% waste that is 36.7 cu ft, which is 62 bags of 80 lb, 82 bags of 60 lb or 123 bags of 40 lb. At that size most people order ready-mix instead.

How many cubic yards of concrete do I need?

Multiply length, width and thickness in feet to get cubic feet, then divide by 27. A thickness of 4 in is 0.333 ft. So 10 x 10 x 0.333 = 33.3 cu ft, or 1.23 cu yd, before waste.

How thick should a concrete slab be?

Four inches is the usual thickness for patios, walks and shed pads. Garage floors and driveways are often 5 to 6 in because of vehicle weight. Footings depend on frost depth and local code, so ask your building department.

How much extra should I order?

The tool adds 10% by default. Subgrades are never perfectly flat, forms bow a little and some concrete is lost in the wheelbarrow. For a very flat base and a small job you can lower it. For a hard-to-reach site, raise it.

When is ready-mix cheaper than bags?

Bags make sense for small jobs. 6.79 cu yd for a 20 x 20 garage floor would take 306 bags of 80 lb, about 24,480 lb to mix by hand. A truck is faster, and the tool rounds the order up to the next quarter yard, the way plants sell it. Plants may charge extra for a small load.

How do I calculate concrete for a round column or sonotube?

Pick Column above. Enter the diameter and the height, and the count if you have several. The volume of a cylinder is pi x radius squared x height. A 12 in tube 8 ft tall holds 6.3 cu ft.

How many 80 lb bags make a cubic yard?

One cubic yard is 27 cu ft. An 80 lb bag yields 0.60 cu ft, so it takes 45 bags. A 60 lb bag yields 0.45 cu ft, so it takes 60. A 40 lb bag yields 0.30 cu ft, so it takes 90.

Is anything I type uploaded or saved?

No. The sums run in your browser. Your sizes are not put in the address bar, not stored and not counted. Only the unit system you picked is remembered in this browser. We count mode names, such as slab or footing, but never numbers.

More from FLXCode

Share Concrete Calculator